In mid-August we worked three days removing almost all of the original clapboard siding, and completed the demolition of the lower level of the rear shed — ready for excavation for the new foundation.
Thanks to all of our wonderful volunteers!
- Installing temporary supporting beams before we complete the demotion of the lower section — ready for the excavation of foundation trenches next week.
- Progress!
-
- The old siding is coming down!
-
- Watermelon break — Dave Poser and Gene Palmer after removing the siding from the wall beyond.
Please help us finish this project and either:
- email a pledged contribution to Bruce Coldham at bcoldham155@comcast.net
or call Bruce at 413-348-6706 or, - mail your contribution directly to NACF at PO Box 9648, North Amherst, MA 01059,